Modernisation · decision basis

Before we touch anything, we know what it does.

Dependency analysis, risk assessment and business value per system — that yields a prioritised roadmap instead of a wish list.

WHY THIS COMES FIRST

Most modernisation projects fail not on technology but on sequence. Work starts where the noise is loudest instead of where the leverage sits. An assessment costs weeks and saves quarters — because afterwards you know what you may touch, what can wait and what you had better never touch.

Three axes, one decision

Every system is rated on the same three axes. Only their interplay shows what has priority.

account_tree

Dependency analysis

Who calls whom, over which interface, with which data structure. Only when the edges are visible does it become clear which system you can touch without dragging three others down.

warning

Risk assessment

End-of-life dates, missing maintenance, single points of failure, knowledge held in individual heads. Risk gets quantified, not sensed.

trending_up

Business value per system

What does this system contribute to the business, how many users depend on it, what does an hour of downtime cost. Technically old does not automatically mean commercially unimportant.

How an assessment runs

1

Capture the estate

Systems, versions, interfaces, hosting locations and ownership. We work with what exists — documentation, configurations, conversations.

2

Rate

Place every system on the three axes. That produces a matrix showing where risk and business value meet.

3

Choose a path per system

Keep, encapsulate, migrate, replace or retire. One recommendation per system with rationale, effort and risk.

4

Cut the roadmap

Sequenced by leverage and dependency, cut into steps that deliver value on their own. No twelve-month block without an interim result.

What you hold at the end

schema

Dependency map

A map of your system landscape with interfaces and data flows — useful far beyond the project, for audits and contingency planning.

grid_view

Rating matrix

Every system placed by risk and business value. The discussion shifts from opinions to positions in the matrix.

route

Prioritised roadmap

Concrete steps in an order that respects dependencies — with an effort estimate per step and a clear first result.

gavel

Decision paper

A document you can move budget with internally: what happens if nothing is done, what each path costs, which benefit arrives when.

WHAT THIS ACTUALLY DELIVERS
2–4

weeks to the decision paper — not months to a first interim report.

None

expensive rework because a dependency nobody knew about surfaces mid-project.

1

shared factual basis for IT, the business and management.

Related

UW
YOUR DIRECT CONTACT
Uwe Winnwa
Sales · cloud37 AG

30-min intro call — free.
No standard pitch. I listen, ask the right questions and give an honest assessment — even if we are not the right partner.